news center
Production News Express
2025-04-10 views 157
On the morning of April 10, the 50,000DWT MR tanker "DINO" built by our group's New Yangzi Shipbuilding for the shipowner Evalend was delivered and departed from the shipyard wharf for operation.
The vessel measures 183m in length overall, 174.5m in length between perpendiculars,32.2m in moulded breadth, 19.1m in moulded depth, design draft of 11.0 m, and scantling draft of 13.30m. Equipped with an open-loop U type scrubber, the vessel meets the EEDI Phase III standards. The vessel, which is the fourth of six vessels in series, cut the first plate in April, 2024, and was built in accordance with the rules and regulations of class LR.
On April 8, "DINO" was signed for delivery.
2025.05.29
Delivery of 50,000DWT MR tanker "JAL KAILASH" built by Yangz…
2025.05.19
Delivery and Departure of the Second 8200TEU LNG (Membrane T…
2025.05.14
Delivery and Departure of The Fifth 50,000DWT MR tanker "INI…
2025.05.07
Delivery and Departure of Group's First 8200TEU LNG (Membran…
2025.05.05
Delivery and Departure of the Sixth 16,000 TEU LNG Dual-fuel…
2025.04.10
Delivery and Departure of one 50,000DWT MR tanker "DINO" bui…
2025.04.10
Delivery and Departure of the Fifth 16,000 TEU LNG Dual-fuel…
2025.04.08
Successful Delivery of 66000DWT bulk carrier "UM JIANGSU" bu…
2025.03.29
Delivery of First 50,000DWT MR tanker "JAL PRERANA" built by…
2025.03.24
Delivery and Departure of 4600 TEU Container Vessel "Xin Qin…